Current Projects
Dutch Barge
This 23mtr 1920s Dutch barge has just arrived for a total interior re-fit including new generator, holding tanks, galley and cabin fit out.
Dutch Barge
sitting on working pontoon
refit
~Interior of the saloon prior to work commencing.
refit
first job was to remove the floor to gain access for installation of new water tanks
refit
what we found was lots of old baulks of timber riddled with woodworm. the white dust in the picture is the result of years of worm activity.
refit
The sub floor was no better, so the whole lot had to come out right back to the hull.
refit
New sub floor went in single layer of 3/4 marine ply treated and sealed before being fitted to new treated bearers.
refit
4 new water tanks and 2 black water tanks were fitted in below decks
refit
The forward cabins both port and starboard were totally refitted with treated T&G and the portside cabin had a king size double bed made with vast amount of storage below.
refit
Both cabins are fitted with sliding door lockers for storage.
Friendship
The barge being named Friendship had the forward bulkhead tiled accordingly
heads
New toilet facilities installed
Heads
Shower facilities and a sunken bath were the order of the day also
Friendship
Corner sink, heated towel rail, mirrors and completely tiled out bathroom
Friendship
New laminate flooring which was laid on to the sub floor which consisted of two layers of 18mm marine ply overlapping each other. The stand alone diesel heater and radiators all set up for some comfortable living.
friendship
Coming off the slipway and ready to head down to Woodbridge
Friendship
Blinds down just to keep the sun off.
Dutch Barge
sitting on working pontoon